📞 07458 148224Discuss a concern
Specialist structural response across Greenwich07458 148224
How the work progresses

Measured decisions.
Permanent outcomes.

Structural defects are rarely simple. A crack, a leaning stack or a damp patch is usually the visible end of a longer chain of cause and effect. Our method interrupts guesswork at every stage — from the first phone call to the final reinstatement — so the repair addresses the cause, not just the symptom.

01

Triage

Understand the symptom, urgency, building type and immediate safety concern.

When you call, we're not booking a job blind — we're qualifying it. We ask about the building's age and construction, when the symptom appeared, whether it's getting worse, and whether there's any immediate danger: loose masonry, active leaks, visible movement. This tells us whether the situation needs a same-day make-safe visit, a standard survey, or professional input from an engineer or surveyor before anyone picks up a tool.

What you get: a clear next step, agreed on the same call — not a generic appointment slot.
02

Inspect

Read the defect in context: materials, movement, moisture and previous alterations.

On site, we don't just look at the crack — we look at the wall, the roof above it, the drainage below it, and the history of alterations around it: removed chimney breasts, past extensions, replaced windows. Where relevant we take moisture readings, check for historic movement through old repairs or crack monitoring gauges, and photograph everything as a dated record.

What you get: a written and photographic record of what we found and why it matters.
03

Specify

Coordinate the appropriate professional input, scope, method and approvals.

Not every defect needs an engineer, but some do — and we tell you honestly which is which. Where structural calculations, party wall agreements, or conservation-sensitive materials are involved, we bring in the right professional and coordinate them so you don't have to manage separate contractors. You receive a written scope: what will be done, which materials will be used and why, indicative timing, and what guarantee applies.

What you get: a scope you can actually understand and approve — no vague line items.
04

Repair

Deliver the structural and fabric work with documented checks and careful reinstatement.

Work is carried out by trained teams using materials appropriate to the building: lime mortar and matched brick on period stock, not one-size-fits-all modern products. Key stages are inspected before they're covered up — foundations, hidden timber, flashings — and reinstatement is treated as part of the job, not an afterthought, matching finishes rather than leaving a visible patch.

What you get: a documented handover pack with before, during and after photos, method statement, and guarantee certificate.

What you receive at each stage

StageWhat happensWhat you get
TriagePhone qualification, urgency assessmentClear next step, same call
InspectSite survey, moisture/movement checks, photosWritten & photographic findings
SpecifyProfessional coordination, scope, approvalsDetailed, plain-English quote
RepairConstruction, staged inspection, reinstatementDocumented handover pack + guarantee

Why the sequence matters

Skipping stages is how temporary fixes and repeat call-outs happen. Quoting before inspecting means pricing blind — which leads to variations mid-job, delays, or worse, a repair that addresses the wrong problem entirely.

Our four-stage method isn't bureaucracy — it's a discipline. Each stage exists to de-risk the next. Triage ensures we deploy the right expertise. Inspection grounds the quote in fact, not assumption. Specification aligns expectations before work starts. And repair, done right, means the defect doesn't come back.

This is the same principle behind our Investigate Before Repair approach — permanent outcomes require understanding causes, not just treating symptoms.

Frequently asked questions

Do I need a survey before I get a quote?

Yes — a proper quote requires seeing the defect in context. Phone estimates are unreliable because they're based on incomplete information. Our inspection ensures the quote reflects the actual scope, not guesswork.

Will you involve a structural engineer automatically?

No — only where it's genuinely needed. Many defects can be specified and repaired without formal calculations. Where an engineer is required for structural movement, load-bearing alterations, or insurance matters, we coordinate them so you don't have to manage separate appointments.

How long between inspection and starting work?

Typically 5–10 working days for straightforward repairs, depending on scope and material availability. Complex jobs requiring engineer input or party wall agreements will take longer — we'll give you an indicative timeline at the specification stage.

Do you provide a written report I can share with my insurer, neighbour or surveyor?

Yes — you receive a documented handover pack including before, during and after photographs, a method statement, and guarantee certificates. This is suitable for insurance claims, party wall discussions, or future property transactions.

What if the defect turns out to be more serious once you open it up?

We'll stop and inform you immediately. Hidden defects — rotten timbers behind plaster, failed foundations under concrete — can't always be seen upfront. We'll provide a revised scope and quote before proceeding: no surprises, no pressure to continue.

Ready to start with triage?

Call 07458 148224 or request a callback — we'll ask the right questions and agree your next step on the same call.